New Fill Room 1 Machine Port
|

Stairway Ready for Concrete
|

Getting Ready to Pour Floor
|

Working on Roof Penetration
|

Moving Dust Collector into Position
|

West Mezzanine Walls from Shipping Area
|

Stairway Enclosure
|

Making Connections to Reactor Tank
|

Setting up to Install Final VFMs
|

New Equipment Controls on Compounding 1
|

Extending Drainline Out of Building
|

Bringing Sterilizer into Room
|

Reactor Tank in Position
|

Walls in Inspection Area
|

Installing Pass-Through in Fill Room 1
|

Puting up Drywall in Office Area
|

Working in Corridor M22
|

Sterilizer in Corridor G05
|

Connecting Ductwork to Fill Room 1 VFM
|

Piping Reworked to the Existing Tanks
|

Piping to Reactor Tank
|

Reactor Tank Hatch
|

Control Panels for Compounding 2
|

Bausch and Stroebel Fill Machine in Place
|

Bausch and Stroebel Fill Line
|

Working on Bausch and Stroebel Unit
|

New Pass Through from Fill Room 1
|

Fill Machine 2
|

Fill Line 2 Post Fill
|

North Corridor
|

Finished Floor in Component Prep 1
|

Fill Machine in Fill Room 1
|

Top of New Reactor Tank
|

European Equipment During Installation
|

De-Rouging Skid
|

AHU 2A
|

Bosch Line
|

AHU 2C
|

Installing Phone in Post Fill Staging
|

Component Washer
|

Fin Work in the Air- Handler
|

Fill Machine in Operation
|

New Security Devices
|

New Capsolute in Component Prep 1
|

New Sterilizer in Component Prep 2
|

New Reactor and Transfer Panel in Place, Old Compounding
|

Post Sterilization 2
|

View of Compounding 1
|